
Thames Water SME Excellence Award
GEL Engineering was contracted for the principal design and build of Oxford Thermal Hydrolysis plant's new steam boiler house. The project entailed the installation of two 7.5-tonne Byworth steam boilers and associated equipment within a constrained space. GEL's team demonstrated a collaborative approach, working closely with stakeholders to develop a layout that optimized both construction efficiency and operational effectiveness.
GEL Engineering successfully managed multiple subcontractors, ensuring high-quality work, adherence to stringent health and safety standards, and effective communication throughout the project. The result is a state-of-the-art boiler house that not only meets the client's requirements but also generates excitement among the staff who will operate within this cutting-edge facility.