Thames Water
AMK
£150 Mil
£0.45 Mil
Scope
Installation of new Odour Control Covers onto the existing Inlet works at Deephams Sewage Treatment Works. As part of the larger upgrade, AMK contracted Gelengineering to install the specially manufactured GRP odour control covers onto the existing structures.
GEL Involvement
This project required very careful planning and implementation to complete a safe installation over live flows onto existing structure. GEL needed to remove existing access steelwork and install the new fabricated GRP sections to tight tolerances ensure any odour is retained and removed via a new series of air removal pipes. GEL Engineering were delighted to be part of this project contributing to a cleaner more odour free area at Deephams and its surroundings.