Scope
Design construction and installation of a new GEA Dewatering Centrifuge, to increase sludge de-watering capabilities at Deephams. This project consisted of replacing one existing unit with a new GEA dewatering unit, followed by full D&B of a new additional GEA Unit.
GEL Involvement
GEL Engineering were responsible for designing the new foundations, supporting structural steelwork, drainage, road widening and access ways followed by installation to a tight budget and time frame. The project required careful consideration and construction given the proximity to the existing operating centrifuge units. GEL Engineering worked closely with GEA and Thames Water to ensure this new unit was up and running to assist with sludge processing on site.