Valves and Chamber Improvements

  • Chamber A (Before)

    The scope of works was to replace the existing tank outlet valves within the outlet chambers and install a new downstream isolation knife gate valve.

  • Chamber A (After)

    The Client also required the concrete roof slab to be replaced with a grated steel platform and suitable lighting. Gel Engineering devised an innovative solution to assist the Client in the complex task of draining the buffer tanks to enable the works.

  • Chamber B (Before)

    As the project progressed the Client’s needs evolved to include concrete aprons to the surrounding area and additional minor works.

  • Chamber B (After)

    We always take a comprehensive and holistic view to our Client’s needs. GEL believe continuous engagement and clear communication are vital to ensure a project’s success. In any project, a client’s needs are always developing, and we like to ensure that these requirements are promptly met with a suitable and often innovative solution.