Digester Upgrade

Scope of Works

Demolition and replacement of the existing concrete roof on a 22.7m diameter anaerobic digester with a new membrane roof with a capacity of approximately 1910m3. The project includes the follow key elements:

  • Demolition of existing concrete roof structure

  • Extension of the existing digester perimeter wall by 1m

  • Installation of new double membrane roof system

  • Installation of new digester pumped mixing system

  • Upgrade of existing electrical configuration involving installation of new MCC including associated ICA works

Using our inhouse design capability, GEL has been working in close collaboration with The Client to develop the design of the Digester upgrade project. The project aligns with the latest standards and uses the latest industry technology to ensure the final design solution is safe, cost efficient and meets operator expectations and maintenance requirements.

In-House Design